Woodyfuel – Solar Panels

Woodyfuel solar panels at Cramlington facility

Solar Panel Installations – Proven Results

Woodyfuel – Winterton, Scunthorpe – 123.54kWp solar PV system

In December 2024, Green Team Partnership commissioned a 123.54kWp solar PV system at Woodyfuel’s Winterton biomass production facility, marking the first stage of a wider rollout across multiple UK sites. The installation forms a key part of Woodyfuel’s Net Zero plan and long-term Sustainability Strategy.

The system, comprising 284 JA 435W modules, is projected to save approximately £22,877 per year in energy costs. Following the success and proven performance of this installation, Green Team Partnership was subsequently awarded new projects at Alnwick and Cramlington, extending Woodyfuel’s renewable energy investment across its operations.

Woodyfuel solar panels at Cramlington biomass production facility
Woodyfuel solar PV panels Cramlington facility
Woodyfuel solar PV panels system

Woodyfuel Project Impact and Benefits

  • Substantial Annual Savings: The 123.54kWp array generates enough clean energy to reduce electricity costs by over £22,000 per year, providing rapid return on investment.
  • Scalable Renewable Strategy: This installation serves as the blueprint for future solar projects across multiple Woodyfuel sites, reinforcing their company-wide sustainability drive.
  • Carbon Reduction Leadership: The project directly supports Woodyfuel’s Net Zero targets, cutting emissions and strengthening their ESG credentials within the biomass and renewable energy sector.
  • High-Performance System Design: Built with 284 premium 435W panels to ensure maximum generation efficiency throughout the year.
  • Trusted Partnership: Following successful delivery, Green Team Partnership continues to support Woodyfuel’s expansion, showcasing reliability and long-term collaboration in achieving sustainable growth.
N

123.54 kWp

Solar PV system size

N

284 x 435W

Solar modules

N

£22,877

Annual savings

N

Real time energy monitoring system

N

Performance visibility and compliance

N

December 2024

Installation Commissioned Date