Northumberland · March 2026

North East Grains: 198 kWp grain drying site installation

430 panels on a trapezoidal roof at a major Northumberland grain drying site, cutting bills by over £25k a year and reducing carbon for a high-consumption agricultural cooperative.

System size
198 kWp
JA Solar modules
430 x 460W
Solis inverters
2
Install duration
4 weeks
Annual benefit
£25k+
Agreed
March 2026

In March 2026, Green Team Partnership agreed a deal to install a 198 kWp farm rooftop system at a major grain drying site in Northumberland. With North East Grains’ consumption very high, the installation significantly reduces operational energy costs and carbon output.

The system is made up of 430 x JA Solar 460W modules, mounted on a trapezoidal roof using specialist equipment for maximum efficiency. There are also 2 x Solis high-performance inverters mounted externally. The install was completed in 4 weeks.

Impact and benefits

  • Reduced cost. The client will benefit by over £25k per annum in reduced bills and revenue from export.
  • Low-maintenance design. Quality components and professional installation keep the system producing for decades.
  • Reduced reliance on fossil fuels. The project contributes directly to North East Grains’ aims to reduce carbon consumption.

On site at North East Grains

Tap any photo to see it full size.

1 / 2

Aerial view of the North East Grains rooftop array beside the grain handling plant
Aerial view of the North East Grains rooftop array beside the grain handling plant
Wide view of JA Solar modules across the North East Grains trapezoidal roof
Wide view of JA Solar modules across the North East Grains trapezoidal roof