South Tyneside Council – Solar Panels

South Tyneside Council solar PV panels

Bespoke Solar Panel System

South Tyneside Council – Horsley Hill Campus – 103.75kWp solar PV system

As part of South Tyneside Council’s sustainability programme, Green Team Partnership delivered a 103.75kWp solar PV system at Horsley Hill Campus, one of three council schools completed in 2023. Earlier that year, the team also installed systems at West Boldon Primary School and Hedworthfield Primary, reinforcing the Council’s commitment to renewable energy in education.

This installation required a bespoke design to accommodate the roof’s curved structure and TPO membrane. A specialised fixing process was developed using hot welds and dual liquid sealing to ensure every penetration was watertight and durable. Despite the technical challenges, the project was completed on schedule and met all client quality expectations.

South Tyneside Council Solar Panels Supplier
South Tyneside Council Solar Panels TPO Roof
South Tyneside Council Curved Solar Panels

South Tyneside Council Project Impact and Benefits

  • Tailored Engineering Solution: Custom mounting design overcame complex roof conditions without compromising structural integrity or waterproofing.
  • Reliable Renewable Power: The 103.75kWp system now provides a steady source of clean electricity to the school, cutting grid use and lowering utility costs.
  • Sustainability in Education: Supports South Tyneside Council’s goal to embed environmental responsibility across local schools and community facilities.
  • Proven Delivery Record: Completed alongside two other Council projects, showcasing Green Team Partnership’s reliability, adaptability, and attention to detail.
  • High Client Satisfaction: Delivered safely, on time, and to specification, earning strong feedback from the Council for quality workmanship and project management.
N

103.75 kWp

Solar PV system size

N

250 x 415W

Solar modules

N

Curved TPO roof

Bespoke solar PV technology
N

Returning Client

N

2023

Installation Commissioned Date

 