NHS Ambulance – Solar Panels
Solar Panel System – Long-term cost control
NHS – Bluchers Ambulance Station, Newcastle – 128.76kWp solar PV system
In September 2024, Green Team Partnership delivered a 128.76kWp solar PV system for the NHS at Bluchers Ambulance Station in Newcastle.
Part of the NHS’s wider sustainability programme across the North East, this installation features 296 high-efficiency 435W panels designed to lower the site’s electricity demand and reduce reliance on grid power. By generating clean energy on-site, the ambulance station benefits from long-term cost control and a smaller carbon footprint.
Following a competitive procurement process, Green Team Partnership was selected for its technical expertise, value for money, and proven record in complex public sector installations.
NHS Ambulance Project Impact and Benefits
- Lower Energy Expenditure: The system produces a consistent supply of renewable power, cutting annual electricity costs and shielding the NHS from price volatility.
- Environmental Leadership: Contributes directly to the NHS’s Net Zero commitments by reducing operational emissions and supporting greener healthcare facilities.
- Operational Resilience: On-site generation ensures greater energy stability, keeping essential ambulance operations powered efficiently throughout the year.
- Engineered for Longevity: Built with robust, premium-grade 435W modules and precision installation for lasting performance and minimal maintenance.
- Trusted Delivery Partner: The project highlights Green Team Partnership’s strength in delivering high-quality solar solutions for critical public infrastructure.
128.76 kWp
Solar PV system size
296 x 435W
High-efficiency solar modules
£22,877
Annual savings
Real time energy monitoring system
Performance visibility and compliance
September 2024
Installation Commissioned Date