Durham County Council – Solar Panels

NHS solar panel system

Ground-mounted Solar Panel System

Durham County Council – Tanfield Business Centre – 750 high-performance modules

In 2019, Green Team Partnership designed and installed a ground-mounted solar PV system at Tanfield Business Centre for Durham County Council. The 750-module array complements a previous rooftop installation, increasing renewable generation and cutting the Council’s reliance on grid power.

Appointed through a competitive tender, Green Team Partnership was selected for its proven expertise and certifications in large-scale ground-mounted projects. The system continues to deliver notable energy savings, lower costs, and reduced carbon emissions across Council operations.

Durham County Council Project Impact and Benefits

  • Expanded Renewable Capacity: Complements the existing rooftop installation, greatly increasing on-site solar generation potential.
  • Lower Energy Expenditure: Reduces annual electricity costs while enhancing protection against energy market volatility.
  • Public Sector Sustainability: Reinforces Durham County Council’s environmental leadership and ongoing investment in green infrastructure.
  • Proven Delivery Partner: Appointed through a rigorous procurement process based on quality, competence, and industry certification.
  • Durable Ground-Mount Design: Engineered for long-term reliability with optimal panel orientation and low-maintenance operation.
N

750

High-performance solar modules

N

Ground-mounted solar PV system

System type

N

Performance visibility and compliance

N

2019

Installation Commissioned Date

 